D2 Valve
video

D2 Valve

The pressure regulator can basically be said to be a pressure reducing valve, the working principle of the pressure reducing valve is as follows: the high-pressure medium is filled into a relatively large chamber through a small hole to achieve pressure reduction, in fact, it is by interceptor pressure reduction, the two sides of the diaphragm or piston are out of the mouth, and the other side is artificial pressure.
Send Inquiry
Chat Now
Product Introduction

Type

GOVERNOR VALVE

Place of Origin

Zhejiang, China

Purpose

For replace/repair

OE NO.

5004049

Material

Aluminium Alloy

Application

AIR HANDLING SYSTEM

Gross Weight

24.24 KGS

Net Weight

21 KGS

Packing Quantity

50 PCS/CTN

Package Dimensions

34 CM*28 CM*35 CM

 

Description

 

5004049 D2 valve belongs to GOVERNOR VALVE. The pressure regulator can basically be said to be a pressure reducing valve, the working principle of the pressure reducing valve is as follows: the high-pressure medium is filled into a relatively large chamber through a small hole to achieve pressure reduction, in fact, it is by interceptor pressure reduction, the two sides of the diaphragm or piston are out of the mouth, and the other side is artificial pressure.

50040491
50040492
50040493
50040495
50040494

 

Features

 

5004049 D2 valve belongs to AIR HANDLING SYSTEM. The exhaust port size is 1/8 in-27 NPT.

50040492
50040493
50040494
50040495
50040496

 

Packing and Shipping

 

5004049 packing

 

Facility

 

Facilit

 

Certificates

 

Certificates

 

Warehouse

 

Warehouse

 

Flow List Example

 

Flow list example

 

Exhibition

 

Exhibition

 

FAQ

 

Q:Can you produce the products according to our requirements?

A:If you need it, please inform us your specific requirements.

 

Q:Are you a factory or a trading company?

A: We are a factory. It was established in 2011. We have been specialized in the line for more than 13 years with high quality, competitive price and complete specifications as a result of advanced production lines, top-great testing equipment and standardize management.

 

Q:How to place an order and make payment?

A:You can place orders through various payment methods such as online platforms or bank transfers.

 

Q:How long will it take to receive the accessories after placing the order?

A:The logistics transportation time varies by region. Generally, the goods are shipped within 3-7 working days after placing the order. Please check the logistics information for the specific arrival time.

 

Q:How to guarantee the quality of your products?

A:

1) Strict detection during production.

2) Strict sampling inspection on products before shipment and intact product packaging ensured.

3) Each order will provide the corresponding packing list and shipment pictures.

 

Send Inquiry

whatsapp

teams

E-mail

Inquiry