VS228 Leveling Valve
|
Type |
LEVELLING VALVE |
|
Place of Origin |
Zhejiang, China |
|
Purpose |
For replace/repair |
|
OE NO. |
VS228 VS-228 |
|
Application |
AIR SUSPENSION SYSTEM |
|
Gross Weight |
23.2 KGS |
|
Net Weight |
20.2 KGS |
|
Packing Quantity |
40 PCS/CTN |
|
Package Dimensions |
50 CM*29 CM*43 CM |
Description
VS228 Leveling Valve belongs to levelling valve.
The VS228 height control valve is a smart suspension regulator that dynamically adjusts vehicle stance based on road conditions and driving dynamics. This advanced component bridges mechanical and electronic control systems to optimize both comfort and performance.
Dual-Mode Height Adjustment:
·Rough Terrain Mode
-Raises chassis 50-75mm for improved ground clearance
-Activates within 3 seconds at speeds below 30 km/h
·Highway Mode
-Lowers vehicle 20-30mm at sustained speeds >80 km/h
-Reduces aerodynamic drag by 12%
Performance Benefits:
·40% reduction in body roll during cornering
·Automatic leveling with heavy loads
·Protected underbody components on rough roads





Features
VS228 Leveling Valve belongs to air suspension system. This air suspension valve features 1/4" NPT supply, suspension, and dump pilot ports, ensuring precise height adjustment in commercial vehicle applications.





Packing and Shipping

Facility

Certificates

Warehouse

Flow List Example

Exhibition

FAQ
Q: How large is the area of your factory?
A: The area of our factory is over 3000㎡.
Q: How to place an order and make payment?
A: You can place orders through various payment methods such as online platforms or bank transfers.
Q: How to handle returns and exchanges if the received accessories are not satisfactory?
A: Please contact our customer service within 3 days after receiving the product, explain the reason for return or exchange, and follow the customer service instructions to complete the return or exchange process.
Q: How about the product quality?
A: We hold the most strict quality control system in the market.
Q: How do you control product quality?
A:
1) Each production batch will have a task list and a flow list.
2) Each batch of products will go through the first inspection, random inspection and final inspection, three processes to control the quality
Previous
Switch Air SuspensionYou Might Also Like
Send Inquiry















